-
Your shopping cart is empty!
EVM EWBS-018 2D Wired Barcode Scanner (Black)

- Brand: EVM
- Product Code: EWBS-018-2D
- Availability: In Stock
EVM EWBS-018 2D Wired Barcode Scanner (Black)
Offer Price
₹1,600
(68% off ) ₹4,999
Free Delivery
Check
Delivery is guaranteed as long as our locations stay open according to government regulations.
Features:
Barcode Scanner Wired EWBS-018 2D
● 1D/2D Code
● Laser Aimer
● Ergonomic Design
● 300 Scan Per Second
● Drop test 3M
● USB Interface
● RS232
● 1.8 M Cable
Specifications:
| Model Name | EWBS-018 2D |
| Interface | USB |
| Scan Per Second | 300 |
| Connectivity | Wired |
| Color | Black |
| Warranty | 2 Years |
| Note | *** Features, Price, Specifications are subject to change without notice. |

















